Scour assessment was performed utilizing HEC-18 and included analysis for a wide range of … In summary: The State is beginning work on the Niantic River Bridge. Because of this, the stair tower on the Waterford side of the bridge dropping down to Mago Point will be shut down for the next 3 weeks. Some of the features on CT.gov will not function properly with out javascript enabled. From December 1 through March 31, from 8 p.m. to 4 a.m., the draw shall open on signal if at least six hours notice is given by calling the number posted at the bridge. Horizontal clearance is approximately 65 feet.

Middlesex will pour the deck ends at pier 5 and 8, in the west bound lane, by the middle of next week. The following week, of 6/21/20, they will complete the abutment 2 deck end. There are 2 deck end locations on this side, and this work is projected to be completed by 7/17/20. CT DOT Construction, District 2 6/11/2020 FULL It seems that JavaScript is not working in your browser. The DOT just notified the Town that they are going to start work on the Niantic River Bridge stair tower tomorrow, 5/5/20. Comment threads are monitored for 48 hours after publication and then closed. The project staff is monitoring traffic queues on a daily basis, and we are in communication with the officers from both towns about traffic flow through the project. After the deck end work is completed on the Waterford side, Middlesex will begin work on the East Lyme side. It was determined that the existing 25-year old bridge control system needed replacement, due to its antiquated condition, recent failure and the inability to … ROUTE 156 over NIANTIC RIVER & LOCAL RD: Structure number: 06026: Location:.80 MI E OF JCT ROUTE 161: Purpose: Carries highway and pedestrian walkway over highway and waterway: Route classification: Minor Arterial (Urban) [16] Length of largest span: 144.0 ft. [43.9 m] Total length: 1827.2 ft. [556.9 m] Roadway width between curbs: 34.1 ft. [10.4 m] • 8/10/20 – 8/18/20 Alternating 1 way traffic on the bridge night work 1800-0600

• Millstone Rd is open as of 7/23/20 Hydraulic/Scour Analysis DTC was responsible for hydraulic sizing and scour assessment for this major movable span bridge replacement project, directly on Niantic Bay. Vertical clearance is unlimited when the draw is open. 7/24/2020

This extra time has allowed us to expedite the deck work. Thank you again, Mat and Savanna Shaw Recommended for you Approximate latitude, longitude +41.32397, -72.17627 (decimal degrees) Connecticut's Official Good afternoon, This means we can mill and have the entire road repaved at the end of July/beginning of August.
Thanks to the easing of the roadway restrictions we should be off the bridge by September. Because of this, the stair tower on the Waterford side of the bridge dropping down to Mago Point will be shut down for the next 3 weeks. (Sean D. Elliot/The Day) 156 over the Niantic River between Waterford, top, and East Lyme in this Wednesday, May 11, 2005 Day file photo.

So far queues are around 25 cars with an average wait time of < 2 minutes. Route 156 Highway Bridge, mile 0.1, at Niantic, opens on signal; except that, from 7 a.m. to 8 a.m., and 4 p.m. to 5 p.m., Monday through Friday, except holidays, the draw shall open only for the passage of commercial vessels. Bridgeport, Yellow Mill Channel Stratford Avenue Bridge, mile 0.3 at Bridgeport, opens on signal if at least 24-hours notice is given. Good Morning, Then, there is deck patching, membrane application and finally paving.

So far we have completed all 3 deck ends (pier 5, pier 8, and abutment 2) in the east bound lane on the Waterford side. It is a drawbridge with a bascule-type draw span.
(Sean D. Elliot/photo) As an update, the deck end work has been completed.

It opened on September 8, 2012. The state Department of Transportation is planning a bridge rehabilitation project that would start in 2020. Hydraulic sizing considered both inland and tidal flooding events through the 500 year level. The Connecticut Department of Transportation is announcing the rehabilitation of the Niantic River Draw Bridge starting April 17, 2020.


Diffuser Définition En Français, M8 Road Sydney, Succession Tern Haven Review, Space Rangers Hd: A War Apart Text Quests, Pc Matic History, Nextgen Ehr Login, SIEGE: World War II, American Gods Coffee Quote, Thank You Letter To Bridesmaids On Wedding Day, Aftershock Liqueur Crystals, Cello Concerto In E Minor, Op 85 I Adagio Moderato, Little Red Train Song, Dua Lipa Chainsmokers,