It is proposed to upgrade the same to four lane facility with rigid pavement under TNIPP – I. 243.70 Crore for forming two bypasses at Kelambakkam (4.675 km) &Tiruporur(7.45 km) under TNIPP-II as Ist stage.

The estimated project cost including the non civil works like supervision charges, Quality control, escalation etc. Tamil Nadu State Highways Network has seven circles: Chennai, Villupuram, Madurai, …

Ltd (a consortium of M/s GMR Infrastructure Ltd, M/s GMR Energy Ltd and M/s NAPC Ltd), on ‘Design, Build, Finance, Operation and Transfer’(DBFOT) Semi Annual Annuity basis under Public Private Partnership (PPP), through an internationally competitive bidding process.
The work was awarded to M/s R Ramu Engineering Contractor at a project costofRs 41.91 Crores.
23.78 Crore. The proposed new road will connect the Northern Gate of Ennore Port and Thatchur on NH-5 with an additional spur road for connecting to the Thiruvottiyur–Ponneri-Pancheti (TPP) Road. The total length of the road is 2.8 Km. (Ms) No.105 Highways & Minor Ports (HF2) Department dated 26.12.2017 has accorded in principle approval to take up the project under JICA assistance. All the above works have been completed in all respects and the Hon’ble Chief Minister of Tamil Nadu inaugurated the project on 14.2.2016.The scope of work involves widening the existing road to four lanes with service road and storm water drain on either side, construction of two major bridges, two minor bridges and two pedestrian underpasses.

The work has been awarded to M/s. The Government have also appointed TNRDC as an Agency of the Government for the collection of user fee in respect of CORR Phase-I & II.Copyrights © 2020 Tamil Nadu Road Development Company Ltd 0+140 to 0+470 and strom water drain cum service duct on left side, construction of four Pedestrian Underpasses one Vehicular Underpasses and five pipe culvert.

85.19 Crore has been prepared by the consultants for the construction of an additional new Four Lane Bridge on the upstream side and retaining the existing bridge for slow moving vehicles and pedestrians.After carrying out a competitive tendering process, the work has been awarded to M/s RR (JV) in March 2014. 23.88 Crore has been prepared by the consultants for the construction of new four lanebridge in place of the sunken bridge, at Illaiyanarkuppam.After carrying out a competitive tendering process, the work has been awarded to M/s M. Rajkumar in September 2018 and the work is scheduled to be completed in 18 months from the date of award of the contract. The road starts from Madhya Kailash Temple Junction on Sardar Patel Road in south-east Chennai and terminates on East Coast Road near Mamallapuram.Due to heavy movement of traffic and on account of poor soil condition, the pavement of the Corridor had deteriorated. The scope of work involved, improvement and widening to four lane with both side service roads 5.938 km length and strom water drain cum service duct on left side and construction of pipe culverts. Click on any project to view further details.

East Coast Road (ECR), known for its scenic beauty, is an important road corridor in Tamil Nadu connecting Chennai with Cuddalore through Pondicherry.The road was formed in 1998 by interlinking and improving a series of small village roads that were connecting the fishing villages along the coast of Bay of Bengal.Within two years of its formation, ECR started showing signs of distress thereby adversely affecting the riding quality and safety of road users.

The ECR Link Road has also been improved to dual two lane carriageway.Another significant feature of the Project is the construction of service trenches/ducts for conveying utility lines including electrical, telephony and optic fibre cables/wires so as to avoid digging in future. The 2.1 km long ECR Link Road connecting Rajiv Gandhi Salai at Sholinganallur and East Coast Road at Kudumiyandithoppu is also included in Phase-I.In Phase-I, the 20.1 km stretch between Madhya Kailash Temple Junction to Siruseri is widened to dual three lane carriageway with median, service road, pedestrian footpath and planter strip. The bribery is against the Law. Administrative Sanction had been accorded for Rs. The concession period is fixed as 25 years including 36 months construction period.The Honorable Chief Minister of Tamil Nadu had made an announcement for the construction of an Elevated road from Taramani to Siruseri, under phase-I and from Siruseri to Mahabalipuram under Phase-II, for a total length of 45 Km. TNRDC has been appointed as Managing Associate for the Project. Also, administrative sanction of Rs.5.0 Crore has been accorded for the preparation of DPR for the above work, vide G.O.Ms.NO.146 dated 24th September 2013.The DPR has since been finalized for the construction of Elevated Road from Taramani to Siruseri.